INSTALLATION

SERVICE

Fixed simple elevator maintenance matters needing attention

 

Daily maintenance is to ensure that the premise of safe and reliable operation of hoisting machinery, hoisting machinery in daily use process, should be strictly in accordance with the regulations of the random file on a regular basis for equipment maintenance.

Maintenance work can be made of hoisting machinery driver, management and maintenance personnel, and with appropriate qualifications entrusted by the professional unit.

Maintenance notice:

1, on the basis of routine inspection, fixed simple elevator maintenance must be carried out daily, to improve the safety of the equipment, reduce equipment failure rate, guarantee the safe operation of the equipment.

2, fixed simple elevator d danger, safety management personnel should notify the relevant personnel, timely and effectively, completes the necessary safety protection measures, and for maintenance personnel to do a good job of coordination.

3, maintenance, each department should be set outside the security warning signs, and other necessary protective measures, to prevent the irrelevant personnel to enter or involved in an accident.

Replaced parts 4 and repair one by one count, properly handle, not lying and legacy on the fixed simple elevator.

5, repair electrical equipment, must cut off power supply in a reliable way, and in striking out hang "someone repair, no switching" warning card, or send someone care, without the consent of the maintenance staff, no power.

6, must be open and remove the hall door, must be set around the barrier height not less than 1.05 m, to prevent falling.

7, use of fire in the fire area to the hot formalities, and equipped with corresponding fire fighting equipment and caregivers.

Line 8, use the portable lamp the voltage should be not greater than 36 v, and a protective cover.

9, on the top of the hoisting cage during maintenance, must cut off the urgent stop switch and stop layer to protect devices in a protected position.

10, should as far as possible reduce the time in well not for maintenance, before entering the pit must cut off the abrupt stop switch.

11, maintenance for use in emergency unlock keys must be kept properly and keep a irrelevant personnel use.

12, emergency unlock key must pay attention to when using hanging baskets is actual position, the lock after carefully check the reset condition.

13, the maintenance must first after the commissioning, determine the qualified rear can put into use.

14, safety management personnel to improve the quality of maintenance work of the necessary supervision and inspection, to sign for each maintenance, and maintenance records.

15, in daily maintenance by professional unit, if the maintenance personnel such as not according to stipulations cycle maintenance or maintenance of quality problems, management personnel should be timely coordination and maintenance of unit, ensure the normal conduct of maintenance work. 



ADD:Ningbo zhenhai crab pu industrial zone of zhejiang province
TEL:0086-574-86506201
FAX:0086-574-86507362
E-mail:chensanke@sqqzj.cn
Ningbo SanQi hoisting machinery co., LTD (ningbo office)
ADD:Ningbo Jiangbei Road, No. 287 Dazha
FAX:0574-87569911
News|About us|Products|Honor|Service|CONTACT US
Ningbo SanQi hoisting machinery co., LTD © 2008-2013 SQQZJ.CN All Rights Reserved.
T.S:CNNET21 | Privacy Protection | 浙ICP备06001436号